ENVIRONMENTAL IMPACT
ASSESSMENT
STUDIES
- Environmental Impact Assessment Study: Remediation of landline near village Rakotinci-Municipality of Sopiste
- Environmental Impact Assessment Study from the implementation of the Project-Construction of a sanitary landfill in Municipality of Rankovce
- Environmental Impact Assessment Study from the implementation of the Project-Installation of wind power plants (Vetrov park) in Municipality of Krusevo
- Industrial wastewater management Study for the city of Skopje- JICA
- Environmental Impact Assessment Study from the implementation of the Project-Installation of wind power plants in Gevgelija-South, Municipality of Gevgelija
- Environmental Impact Assessment Study from activities for remediation of the landslide in the villages Skudrinje and Mogorce
- Environmental Impact Assessment Study from the expansion and reconstruction of border crossing “Blace”-Administration for customs affairs, Skopje
- Environmental Impact Assessment Study from the implementation of the Project-Establishment of a slag landfill in the vicinity of village Sivec, FENI INDUSTRIES, Municipality of Kavadarci
- Environmental Impact Assessment Study from the implementation of the Project-Temporary installation for disposal of municipal waste for the Municipality of Mavrovo-Rostusa
- Environmental Impact Assessment Study from the implementation of the Project-Construction of the railway track, part of Corridor VIII, section Kicevo-Lin (border with Republic of Albania)- Public Enterprise Macedonian Railways Infrastructure, Skopje
- Environmental Impact Assessment Study from the implementation of the Project-Plant for combined production of electricity and heat, TE-TO, Skopje
- Environmental Impact Assessment Study from the implementation of the Project-Open pit for exploitation of mineral nickel-iron raw material on the locality “Studena Voda”, FENI INDUSTRIES , Municipality of Kavadarci
- Environmental Impact Assessment Study from the implementation of the Project-Construction of a dam and accumulation “Recani” with accompanying facilities (part of the hydro system “Orizarska Reka”), Municipality of Kocani
- Environmental Impact Assessment Study and social aspects from the implementation of the Project-Construction and operation of the hydro power plant “Boskov Most”, ELEM-Macedonia
- Environmental Impact Assessment Study and social aspects from the implementation of the Project-Reconstruction of the railway track, section Dracevo-Veles, part of Corridor X
- Analysis of the deficiencies in the Environmental Impact Assessment Study (EIA) for all sections of the Gas pipeline system in Republic of Macedonia and proposal for necessary additional analyses
- Environmental Impact Assessment Study from the implementation of the Project-Exploitation of mineral raw materials (travertine and onyx) on the locality “Gulabova pestera”, village Besiste, Municipality of Prilep
- Environmental Impact Assessment Study from the implementation of the Project-Exploitation of mineral raw material-travertine on the locality “Dzurovo”, village Trojaci, Municipality of Prilep
- Preparation of an Environmental Impact Assessment Study and logistics for the implementation of the procedure for environmental impact assessment (EIA) for the Project-Construction of wastewater treatment plant (WWTP) for the Municipality of Strumica
- Environmental Impact Assessment Study and social aspects from the implementation of the Project-Construction of infrastructure (collector and treatment plant) for collection and treatment of wastewater in the Municipality of Kicevo
- Environmental assessment report “Project for construction of waste water treatment plant on the terminal for heavy vehicles – border crossing Blace
- Preparation of Environmental Impact Assessment Study for remediation of landslide in the villages Skudrinje and Mogorce.
- Preparation of Environmental Impact Assessment Study for installation of wind power plants in Gevgelija-south
- Wastewater management Study for the city of Skopje – JICA
- Preparation of Environmental Impact Assessment Study for expansion and reconstruction of border post “Blace”.
- Preparation of Environmental Impact Assessment Study for TE-TO, combined gas power plant, Skopje.
- Preparation of Environmental Impact Assessment Study for construction of sanitary waste landfill.
- Preparation of Environmental Impact Assessment Study for open pit for excavation of iron – nickel ore from the landfill site on troska.
- Preparation of Environmental Impact Assessment Study and preliminary design for the railroad Kicevo-Lin border with Albania, part of Corridor 8.
- Preparation of Environmental Impact Assessment Study from installation for collection, storage and processing of hazardous waste and production of diesel fuels G.R.A.D Ecology Ltd. Veles.
- Preparation of Environmental Impact Assessment Study of open pit for exploitation of mineral nickel raw material on the locality “Studena Voda”, Feni Industries, Municipality of Kavadarci.
- Preparation of Environmental Impact Assessment Study and social aspects of the construction and operation of hydro power plant “Boskov Most”
- Preparation of Environmental Impact Assessment Study of dam and accumulation “Recani” with appurtenance (part of hydro system “Orizarska Reka”)
- Preparation of Project studies and Design documentation for railway section Dracevo-Veles, along the Corridor X including branch Xd.
- Preparation of Environmental Impact Assessment study for exploitation of mineral raw (travertine and onyx) of site “Gulabova pestera”, v. Beshishte, Municipality of Prilep.
- Preparation of Environmental Impact Assessment study for exploitation of travertine of site “Dzurovo”, v. Trojaci, Municipality of Prilep.
- Environmental and social impacts assessment study from the project for construction of wastewater treatment plant in the municipality of Strumica
- Environmental Impact Assessment study for the construction of infrastructure for improvement of the wastewater collection and treatment Infrastructure in the Municipality of Kichevo
- Environmental Impacts Assessment study for the project: Plant for treatment of municipal and industrial waste in order to use the usable fractions, KO Shivec, municipality of Kavadarci
- Environmental Impacts Assessment study for the project: Plant for treatment of municipal and industrial waste in order to use the usable fractions, municipality of Bitola
- Environmental Impact Assessment Study and Technical Design Design for Railway Line Kosovo – Podujevo – Border with Serbia for ADT OMEGA – Athens, Greece